Problem: The Gates are situated in one of the leading Petrochemical Industries, M/s. BPCL (Bharat Petroleum Corporation Ltd.). The Conventional system used only Chain-Pulley Block for the operation of the Storm gates also known as Nallah Gates. As the plant is situated near the sea shore, it acts as a baffle during High tide, At the same time these gates baffles the oil spillage and crude waste going to the sea and to protect the interest of the people residing around the BPCL Premises.
There are 4 gates having individual Chain-Pulley system. The gates are of Mild Steel of 2.3 mtrs (W) x 2 mtrs(H) x 10mm(T) and weigh 900 kgs approx. guided by Channels duly fitted on the wall from both sides. Ideally it was convenient to operate the gate through conventional system. But following were the problems faced by the User
Solution: ARHAM had sort out all the above shortfall by introducing full proof Automization system for Lifting the Gates and designed the complete system as per their site conditions as follows:
ARHAM is very much thankful to M/s. BPCL for having faith and giving the opportunity for complete Designing, Installation & Commissioning of a new era of project for the first of its kind implemented in their premises.